Call our sales team 01782 564411 or email info@broxap.com

Three Peaks

SKU
BXTS/3XPK
£POA

The Three Peaks is a distinctive three tier canopy structure developed for demanding public realm environments where architectural presence and reliable weather protection are equally important. Originally installed at Cramlington Specialist Emergency Hospital, this design demonstrates how permanent canopy systems can enhance arrival spaces, pedestrian movement routes, and outdoor waiting areas. Formed from three integrated conic canopies supported on a central column, the Three Peaks provides a robust and visually striking solution for high footfall external settings.
Delivery information Find out more

Product Details:

Integrated Conic Design for Public Use Environments

The Three Peaks canopy features a range of interconnected conic structures, creating layered shelter with a strong sculptural profile. This makes it particularly suitable for projects where the canopy must perform as both functional cover and a recognisable landmark.

Typical applications include:
• Hospital entrances and emergency access routes
• Public transport interchanges and civic forecourts
• Campus walkways and visitor arrival areas
• Outdoor waiting zones in busy public spaces
• Commercial developments requiring permanent shelter

As a public use canopy, it supports safe, comfortable movement in all seasons.



A Permanent Outdoor Canopy Tent Alternative

Unlike temporary structures, the Three Peaks is a fixed installation designed for long-term external use. It provides the practical benefits of an outdoor canopy tent while delivering the durability and specification standards required for public infrastructure.

This permanent public tent solution is well suited to:
• Healthcare estates
• Local authority projects
• Education and community facilities
• High traffic pedestrian environments

The integrated form also creates natural gathering points beneath the shelter.



Materials and Protective Finish

The Three Peaks canopy is manufactured with strength and longevity in mind, using hot dip galvanised structural supports as standard. This ensures excellent resistance to corrosion, even in exposed urban or coastal conditions.

Key performance features include:
• 100% waterproof canopy coverage
• UV protection to reduce glare and heat impact
• Hot dip galvanised supports for long service life
• Optional powder coating to any RAL or BS colour

This combination makes it a dependable three tier outdoor tent structure for year-round use.



Walkway Canopy Coverage with Architectural Impact

The integrated canopy layout provides effective shelter across pedestrian routes, making it suitable as a feature walkway canopy in complex public environments.

The central column and support arms allow for:
• Clear circulation beneath the structure
• Reduced visual clutter compared to multi-post systems
• Strong overhead coverage for entrance approaches
• A cohesive design that complements modern architecture

This is particularly valuable in healthcare and transport settings where clarity of movement is essential.



Specification and Integration Opportunities

The Three Peaks canopy is often specified alongside other Broxap public realm infrastructure to create coordinated external environments.

It can be paired with:
• Street furniture seating for sheltered waiting areas
• Cycle shelters and secure parking systems
• Bollards for pedestrian management and protection
• Litter bins and recycling units to support clean public spaces

This ensures the canopy contributes to a complete, well-considered external scheme.


Product Summary
• Integrated three tier canopy with three conic roof structures
• Supported on a central column with integrated arms
• Installed in demanding public settings including hospital environments
• Waterproof and UV protective for year-round performance
• Hot dip galvanised supports with optional powder coated finishes
• Suitable for permanent public realm and walkway shelter projects

 

Delivery Message

Broxap offer a standard carriage service for all products, this usually takes between 3-28 days as lead times vary on specific products and quantities.

Recent Case Studies

Denton Community College

Denton Community College, Manchester

The power of a good student council has helped to shape six new outdoor areas at Denton Community College...

William Morris Primary School, Swindon

William Morris Primary School, Swindon

Unique rainbow canopies installed at a new primary school are helping to inspire and enthuse pupils...

The Slate Yard (Plot A7), Salford

The Slate Yard (Plot A7), Salford

A dynamic new housing project is benefiting from Broxap’s 75 years of design and manufacturing experience...