Wardale® Cycle Compound

In stock
SKU
BXMW/WAR/COM
£2,542.37

The Wardale Cycle Compound uses the popular design of our best selling Wardale Cycle Shelter. This modular compound is an attractive addition to any external area and extra security features make it perfect for both public and corporate spaces.

The Wardale® cycle compound is constructed in such a modular and retrofitting way that it lends itself to create large compound structures that can include lockable gates, CCTV, internal helmet lockers and rear security panels.


Options:

  • Opposing two shelters creates a versatile and attractive shelter and by adding roof panels, lockable gates and panels the shelter can be made totally secure
  • A variety of high security locking methods are available including integral heavy-duty hasp and staple as standard, sliding bolt (both for users own padlock,integrated cylinder lock, swipe card or keypad).
  • Padlocks can be supplied permanently attached to the shelter with multiple keys.
  • Compound high security gates, panels and roof panels are available in 1000mm, 1250mm and 2000mm widths

This product is protected by U.K. Design Registration Laws, which prohibit unauthorised copying in any form.

Standard Unit Size:

  • Length: 4100mm
  • Width: 5280mm
  • Capacity: 20 Cycles

Features:

  • Can contribute towards gaining ENE8 credits when used in the appropriate situation, under the Code for Sustainable Homes.
  •  BREEAM and Code for Sustainable Homes Compliant.
  • 3600mm long - 16 cycles

  • 4100mm long - 20 cycles

  • 5000mm long – 24 cycles

  • 6000mm long – 28 cycles

  • Other capacity options available for larger compounds

Delivery Message

Broxap offer a standard carriage service for all products, this usually takes between 3-28 days as lead times vary on specific products and quantities.

Carriage charge will be determined and added to the totals in the basket once the postcode of delivery is known and the order is accepted.

Excludes mechanical offloading unless stated otherwise

Recent Case Studies

Greenfaulds High School, Cumbernauld

Brand new Greenfaulds High School required smart external furniture – and expertise from across the Broxap group of companies helped to bring the project to life...

Crookstone Castle Primary School, Glasgow

Crookstone Castle Primary ran a competition amongst the pupils to choose the colour for the cycle shelter that would be installed as part of a schools cycle parking project in 2015/16...

The Bourne Academy, Bournemouth

The Bourne Academy, Bournemouth was to undergo a £10 million renevation, a project that would include many newly constructed areas...

^Top