Burslem Bandstand

In stock
SKU
BXMW/BURS
£POA

As part of an enhancement scheme to the local town park, Stoke-on-Trent City Council approached Broxap Dorothea for assistance in designing, manufacturing and installing a new replacement bandstand. 

This was an ideal commission for Broxap as the council were able to benefit from Broxap’s locality and diverse manufacturing capabilities whilst at the same time drawing upon the knowledge and expertise of the Dorothea division who specialise in heritage structures and architectural metalwork.


Options (£POA):

  • Bespoke size options
  • Submerged fixing
  • Internal lighting or solar lighting

The Burslem bandstand design was based on earlier historical images and sketches of the site which were developed to utilise modern manufacturing techniques in conjunction with both the council and the English Heritage. New patterns were designed and manufactured to produce castings of the main column supports and spandrel brackets, whilst the traditional timber roof construction was redeveloped as a sectional structural aluminium assembly to assist installation. The existing wall slab was retained and enhanced with new stone copings to compliment the perimeter balustrade.

Features:

  • 8 aluminium architectural cast columns
  • Aluminium fabricated roof structure
  • Corrosion resistant material
  • Roof void benefits from a closed soffit
  • Decorative columns and spandrels
  • Rainwater drained internally through columns
  • Decorative finial to top of wave roof profile
  • Robust balustrade panels to the perimeter
  • Guttering

Construction:

  • Cast aluminium columns and spandrel brackets
  • Structural aluminium roof construction
  • Extruded aluminium rainwater system
  • Galvanized mild steel balustrade panels

Single Unit Size:

  • Across corners: Octagonal: 5637mm across roof flats
  • Height to underside of roof: 3430mm
  • Overall Height to finial: 6355mm

Take a look at our colour options.

Delivery Message

Broxap offer a standard carriage service for all products, this usually takes between 3-28 days as lead times vary on specific products and quantities.

Recent Case Studies

Denton Community College, Manchester

The power of a good student council has helped to shape six new outdoor areas at Denton Community College...

William Morris Primary School, Swindon

Unique rainbow canopies installed at a new primary school are helping to inspire and enthuse pupils...

The Slate Yard (Plot A7), Salford

A dynamic new housing project is benefiting from Broxap’s 75 years of design and manufacturing experience...

^Top