

Transforming Places: Broxap Install Projects
We take pride in everything we design, manufacture, deliver and install – whatever its use, wherever it’s going.
Our street furniture, shelters and outdoor sport, play and fitness products are built to serve generation after generation.
Here we share an insight into some of the projects our teams are currently working on. To discuss your partnership opportunities with Broxap, give us a call today.
16.02.2023
14.02.2023
30.01.2023
10.04.2023


Folks at the Forsbrook Recreational Centre in Staffordshire can now enjoy a variety of outdoor exercises thanks to our dedicated installation's team, who were able to install a range of outdoor gym equipment despite the misearble, cold weather.
24.03.2023


22.03.2023


20.03.2023


13.03.2023


Works have recently been completed on three of the hospital sites for Manchester Hospital NHS Trust. The overall contract for this project covers design, manufacture, supply, and installation of three cycle shelters. All works were completed within the agreed programme date.
We have recently commenced groundworks and the installation programme at Sir Robert Pattinson School. The scope of works incudes the design supply, groundworks and installation of two bespoke 20m shelters with a 6m covered area to form a new external dining area.
On behalf of Willmott Dixon, we have recently completed works at Horsham Fire Sation. The overall contract included the supply and installation of a bespoke Aquinas walkway canopy adjacent to the main building; a bespoke car wash canopy, and a set of bespoke Harrowby waiting shelters.
Folks at the Forsbrook Recreational Centre in Staffordshire can now enjoy a variety of outdoor exercises thanks to our dedicated installation's team, who were able to install a range of outdoor gym equipment despite the misearble, cold weather.
16.02.2023


14.02.2023


30.01.2023


17.01.2023


Works have recently been completed on three of the hospital sites for Manchester Hospital NHS Trust. The overall contract for this project covers design, manufacture, supply, and installation of three cycle shelters. All works were completed within the agreed programme date.
After recently completing installation works at Alec Reed Academy, pupils can now enjoy an outdoor learning area. The multi-faceted Newcastle Shelter was specifically designed to follow the contour of the existing school building, offering extended classroom areas.
Works began at Fitzalan High School at the end of November. Since then, we have completed phase one of the installation process installing two tensile canopies at the service yard. Phase two is to commence in February.
Penair Secondary School have recently had their bespoke Newcastle Senior Shelter installed. This neatly asssembled shelter covers the entrance and areas of the staircase.
11.01.23


03.01.23


30.11.22


28.11.22


We have been working with Willmott Dixon to design, supply and install a bespoke Newcastle Monopitch for a new police station and custody suite in Llanelli. The order also includes an Archimedes Cycle Shelter with Sheffield Cycle Stands
Eastland Grange Retirement home is pleased with its recent installation of a modern and stylish Devonshire Entrance Canopy.
This will help to protect the residents from the elements.
A recent installation at Good Shepherd Catholic School consists of a bespoke 70m Newcastle Shelter to the north of the school, a bespoke 35m Newcastle Shelter to the south of the school, a twin conic tensile canopy and a Cambridge Hybrid cycle Shelter.
Pupils at St Paul's Primary School can now enjoy learning outdoors under the Westgate Outdoor Classrom which includes a shade sail, Storyteller's Chair and seating.
23.11.22


19.10.22


18.10.22


17.10.22


Taunton School pupils and staff can now enjoy break time outdoors under our Double Conic Canopy.
Travellers at London Luton Airport can now stay safe and protected from the harsh weather as our team installed a run of bespoke shelters.
Paxton Academy Sports & Science have uplifted their outdoor play area with a Tunnel Climber, Ocean Tray & Chute, Extra Large Sand Pit, Teepee, Mud Kitchen, Play Den, Totems, Chalk Boards, Star Stage and so much more!
Proud to be a part of Kingsbrook Secondary School new state of the art development, installing a vast variety of canopies, shelters, seating, bollards, planters, litter bins, and cycle parking equipment.
06.10.22


29.09.22


26.09.22


20.09.22


Our team have been busy at St Anne's School, installing a Caversham Gazebo, New Sheffield Cycle Shelters, Sheffield Cycle Racks, Westleigh Litter Bins, Litchard Seats and Door Barriers.
The children at Little Sutton School can now enjoy physical development activities, as we installed our Townhill Multiplay Unit, Milton Play Unit and Timber MUGA.
Investing in a greener, cleaner and sustainable future, Manor Drive School can now accommodate for up to 20 cycles with our Apollo Two Tier Cycle Shelter.
Sunderland City Council are helping to tackle litter problems with our flagship Derby Standard Litter Bins.
13.09.2022


09.09.2022


08.09.2022


07.09.2022


Our teams have been on site installing four bespoke shelters, Sheffield cycle racks and door barriers for Edgar Wood Academy in Lancashire.
Our teams have been on site installing a Darell Gazebo. This is one of our most popular timber gazebos. Its versatility means it can be used in a number of ways such as for outdoor learning or to offer playground shade.
We have completed an extensive project at Gayton Primary School. The project included a run of Junior Apollo Shelters, Sheffield Cycle Stands, Scooter Racks, Sherwood Benches, Balksbury Play Unit and Darell Gazebo.
Staff and Students at University Of Surrey Research Park can now enjoy their break outdoors. The project included Litchard Picnic Units, benches, and Maelor Traflex Round Litter Bins.
05.09.2022


28.08.2022


22.08.2022


16.08.2022


Student accomodation in Lanarkshire has had a major cycle parking overhaul with Broxap's Run of Wardale Grande Shelter to suit Two-Tier Cycle System, which has the capacity for 96 cycles!
Back to school! Hartford Manor Community Primary School are enjoying their recently installed outdoor gym, where up to 15 children can exercise together at the same time.
We've recently installed a freestanding Delamere Canopy in the courtyard of Merstham Park Secondary School, along with several Sheffield Cycle Racks, a bespoke timber cycle compound and Luton Entrance Canopy.
11.08.2022


10.08.2022


08.08.2022


04.08.2022


In Stirling, 13 Litchard Seats with grade 304 stainless steel ends have been installed in the city centre. Residents and tourists are delighted with the installation.
The children at Northlands Primary School & Nursery are already enjoying their new outdoor gym that has been installed, consisting of a Children's Activ8 Multi Gym and Children's Motiv8 Multi Gym.
Princess Royal University Hospital in Kent is currently having a bespoke Monopitch Glass Entrance Canopy installed.
Our teams travelled to Waitrose in Longfield, to install Broxap's Burntwood canopy at the store.
03.08.2022


14.07.2022


01.07.2022


30.06.2022


The installation team are back at Luton Airport, installing more bespoke galvanised shelters.
A bespoke Faceted Barton Cantilever Tensile Motorcycle Canopy has been installed at MOD Abbeywood. Fixed with submerged baseplates and waterproof PVC roof cladding.
Hamilton Grammar School is very pleased with its bespoke Newcastle aluminium shelter with guttering and rainwater pipes.
22.06.2022


18.06.2022


16.05.2022


15.06.2022


A series of Newcastle Monopitch Walkways/canopies has recently been installed at Firwood School.
The “safe fix” aluminium glazing bar system reduces the steel work requirement providing a more aesthetic design, whilst maintaining Broxap’s structural standards. The push fit 600m wide roof panels also allow for easy installation saving time on site.
A Newcastle Cycle Compound with 2 Tier Cycle Racks have been installed at St George's University Hospital.
Recently a blox compound and ten Easi Riser systems have been installed at at Christie Hospital.
The installation team has installed cyle parking at Buildnet UK featuring a Littleborough Cycle Shelter and Sheffield Cyle Rack.
09.06.2022


19.05.2022


10.05.2022


20.04.2022


Students at Rudston Primary School are having fun and making use of their outdoor gym equipment including a childrens double sit up bench, waist twister, double strength challenger, tai chi discs, double slalom skier and balance beams.
A Newcastle Monopitch Canopy and Wardale Cycle Shelters have been installed at Chapel Lane School, for Morgan Sindall.
An Apollo Shelter, Cambridge Shelter, three Easi-Risers and three Sheffield Cycle Racks have been installed at Silverstone Park.
The installation team has installed cyle parking at Isleworth & Syon School, a school in Middlesex featuring a Littleborough Cycle Shelter and Sheffield Cyle Rack.
19.05.2022


16.05.2022


14.04.2022


13.04.2022


The head teacher is very happy with our recent playground installation at Whitewater Primary School.
This Anti-Vandal Wardale Cycle Shelter has been installed at Leverndale Hospital in Glasglow with custom-designed side panels.
Parkdean Newquay Holiday Park has a fresh new look! Our Installation team have been kept busy and have installed a canopy, playground equipment, and a basketball pitch!
Broxap’s installation team have installed a twin conic for Parkdean Southview. The canopy will provide shade and a cover for people who wish to sit and enjoy time outdoors whilst at Holiday Park.
06.04.2022


31.03.2022


21.03.2022


17.03.2022


A raft of improvement works have been carried out by our teams at the University of Bath. Working with client Dave Lucey Limited, two Fixed Square Parasols have been installed on campus. The Tensile Structures form part of a new outdoor recreation zone. Twelve Mild Steel Bench Units, two of our Fire resistant Derby BBQ Secure bins and an Outdoor Table Tennis Table also form part of the scheme.
Two sleek new cycle shelters have been installed at The William Allitt School in Swadlincote, Derbyshire. Our teams have fitted a run of two New Sheffield Junior Cycle Shelters at the secondary school, each with clear cladding and a galvanised frame powder coated Dark Blue. Two mild steel Sheffield Junior Cycle Racks complete the project, providing secure cycle parking for a total of 20 bikes.
Scooter and cycle parking has been installed at Glassford Primary, a school in South Lanarkshire.
Our teams were on site at Glassford Primary School where our standard Wardale Shelter now accommodates a Junior Sheffield Cycle Rack for up to eight bikes. A single sided Scooter Rack also fits inside the shelter, with parking space for 10 scooters.
Our customer South Lanarkshire Council aims to increase the number of children walking, cycling and using public transport to travel to school. It is hoped having dedicated secure storage at Glassford Primary School will encourage more pupils to cycle or scoot to lessons.
Broxap’s installation team has completed a cycle parking scheme as part of works to convert a library. The former Roger Ascham library facility in Cambridge will now house the Cambridgeshire Register Office. Working with principal contractor Borras Construction Limited, we installed a Wardale Cycle Shelter on site along with a Senior Sheffield Cycle Rack with four hoops. The shelter will provide secure cycle parking for eight bikes. Three further Sheffield Stands were also supplied.
14.03.2022


08.03.2022


28.02.2022


24.02.2022


Extensive cycle parking infrastructure has been installed at the site of a former banana factory in Essex, Little Canfield. Five New Sheffield Shelters have been installed along with five Senior Sheffield Cycle Racks at the site in Little Canfield. Our teams have been working in partnership with contractor Ashe Construction on the redevelopment project.
A car park now also features parking for bicycles too. Broxap was commissioned as part of a Carmarthenshire County Council cycle parking scheme to install the Castleford Shelter and three Senior Sheffield Cycle Stands. The parking facilities are available in Tumble Car Park in Llanelli.
Installation teams visited the site of a new Integrated Medical Centre (IMC) to complete cycle parking works. Our installers worked with client Neilcott Construction to fit a standard Wardale Shelter at the IMC in Corringham, Essex. Broxap Street Furniture also supplied 11 stainless steel Sheffield Cycle Hoops; five stainless steel bollards and one our Weyburn mild steel open top bins.
Our design and installation teams have worked around challenging ground conditions to complete a cycle parking shelter for Holyoakes Field First School in Redditch. Our bespoke Premier Cycle Shelter will accommodate 24 cycles, and a mix of junior and senior Sheffield Cycle Stands have also been installed by Broxap. Children who scoot to school can safely leave their scooters in one of three Single Sided Sooter Racks which we supplied.
15.02.2022


11.02.2022


07.02.2022


02.02.2022


We’ve completed work on a new entrance canopy and covered walkway at Tor View School in Lancashire.
The work formed part of a project being carried out by Landscape Engineering Limited and provides a warm welcome for pupils, staff, parents and visitors.
Our engineers came up with a bespoke Newcastle Monopitch/Duopitch design with clear roof cladding and a galvanised and polyester powder coated steel framework.
Our installation team has completed a cycle parking project for Cambridge City Council.
A customised Wardale Shelter has been installed in Edgecombe, featuring trapezoidal roof and end panel cladding.
Swing mesh gates with mechanical coded lock help to ensure bikes are left securely, with a Senior Sheffield Cycle Parking Rack for 12 cycles also installed with the shelter.
New cycle parking is now available at Whittington Hospital in London. Workign with Richard Morris (Constrution) Limited, we supplied and installed a shelter and cycle rack in the hospital grounds.
The Lightwood standard Shelter has clear cladding with a galvanised steel frame, powder coated black. Our Senior Sheffield Cycle Rack had six hooops to provide capacity for 12 cycles.
Cycle parking has been enhanced at a prestigious business location with support from Broxap. Our teams have completed the installation of three Wardale Cycle Shelters at The Heights in Weybridge.
The shelters all feature clear cladding and a smart galvanised and powder coated frame. Each comes with a Sheffield Cycle Rack made up of five hoops, giving the shelters secure parking capacity for 10 bikes.
The work was carried out on behalf of sustainable travel experts Road Pals Limited, trading as easiNETWORK.
31.01.2022


28.01.2022


27.01.2022


27.01.2022


Children at Ripley Nursery School in Derbyshire can now enjoy their playground again after our team installed a new canopy.
Our freestanding Newcastle Monopitch canopy provides covered access to and from the nursery school, and a safe, dry area for youngsters to play and learn.
Cycle parking has been installed at a Buckinghamshire School undergoing a £5.8 million expansion.
Our team has insalled Broxap's Premier Continuous Run of shelters at Amersham School. With capacity for 40 cycles, the shelter has clear mutliwall polycarbonate roof cladding and its galvanised framework is powder coated RAL 9005 Black.
The cycle parking element of a project carried out for B&k Building Services has been completed at a major new distribution centre.
The Amazon EMA2 site in Sutton-in-Ashfield offers cycle parking for 40 bikes. Two Coventry Gullwing Canopies keep the cycles and riders safe and dry, with the bikes secured to our Senior Sheffiled Parking Racks. Our teams were on site earlier in the year to also install bespoke smoking shelters.
Cycle parking has been installed at Hartford CE High School in time for the return of students following the winter break.
Our engineers came up with a customised Wardale Shelter for the school to accommodate up to 28 bikes. The galvanised steel shelter has been powder coated RAL 5015 sky blue and includes mesh sliding gates. Three Senior Sheffield Cycle Racks were also installed.
25.01.2022


19.01.2022


18.01.2022


13.01.2022


Our installers have completed a series of fabric structures as part of a £12 million new school build.
The outdoor canopies have been installed at Alfreton SEN School in Derbyshire and include two fixed parasols and a triangle perimeter beam shade sail canopy.
The installations will enable students to make the most of their outdoor areas when the new school, being built by contractor Henry Brothers, opens later this year.
Cycle parking has been included in a new housing development.
Broxap teams have installed a New Sheffield Shelter and a Senior Sheffield Cycle Rack, for up to eight bikes, at the Vistry Homes site in Wombourne. Fletcher’s Rise is a collection of two, three, four and five bedroom homes.
A school’s outdoor area has been upgraded with a shelter from Broxap Street Furniture.
Western Primary School in Winchester has invested in a Bespoke Newcastle Monopitch Canopy. Pupils can now take advantage of learning outdoors whatever the weather.
Broxap’s cycle parking products are supporting Carmarthenshire’s bid to become the Cycling Hub of Wales.
Our teams have installed a Wardale Anti Vandal Shelter at Carmarthen Leisure Centre including seven Sheffield Senior Cycle Stands. The work forms part of the Carmarthenshire active travel network to connect residential areas with shopping, employment, healthcare and leisure sites.
06.01.2022


04.01.2022


22.12.2021


21.12.2021


Our installation teams have completed a cycle parking project for Carmarthenshire County Council.
The Wardale shelter and Sheffield cycle parking stands have been installed in Quay Street, Ammanford, as part of the council’s parking strategy.
It hopes that by providing the facilities, more visitors to the town centre will be encouraged to travel via more sustainable forms of transport.
New cycle parking facilities have been installed as part of a depot expansion at metal distributor Kloeckner Metals UK.
Our team visited the company's Dudley site to install a standard run of Broxaps Apollo Shelters to accomodate up to 15 cycles.
Fiftenn of our Sheffield Senior Cycle Stands were also supplied.
Supermarket Waitrose in Hexham has a new van loading canopy and a covered walkway.
Our installation teams have been on site to carry out the works which included a Newcastle Senior Shelter in the van loading area. This oversails a second bespoke shelter which forms a covered walkway around the building.
Cycle parking has been installed at a new logistics park. Working for client Readie Construction, our installation teams have been on site at G Park, Bedford, to complete the project which includes parking for motorbikes and cycles.
Our Apollo standard shelter includes a bespoke parking rack for five motorbikes while our senior Harrogate cycle rack provides parking for 30 cycles, protected by another Apollo shelter. A parking rack for a further eight cycles has also been installed.
21.12.2021


20.12.2021


17.12.2021


15.12.2021


Secure cycle parking has been installed at a new housing development in Peterborough.
Working for client Lindum Group, our installers completed the works for a Wardale Shelter to accommodate 12 cycles.
The shelter features a high security swing gate and a Senior Sheffield Cycle Rack.
Smoking shelters have been installed at a new distribution centre run by Amazon. The site at Summit Park in Sutton-in-Ashfield now features two glazed shelters manufactured by Broxap to a bespoke design.
The shelters include cigarette bins, lighting and our Litchard benches. Two Coventry Gullwing canopies are also being installed to offer cycle parking for 40 bikes, featuring our Senior Sheffield parking racks.
Two bespoke Burntwood canopies have been installed by our teams at Waitrose in Beckenham.
The canopies form a drive-through collection point for online orders. Customers park under the canopy in a dedicated spot before being greeted by a member of staff and the items brought to their vehicles.
Children at Linton Primary School in Swadlincote can look forward to learning outdoors under the protection of a Newcastle Monopitch shelter.
The canopy includes a PVC roll-up blind to one end to provide shade in the summer and protect against the wind in the winter. Guttering and protective foam pads have been installed as part of the project.
An MOD site in Wiltshire has new cycle parking in place.
Our installers visited MOD Lyneham to complete the works for a Wardale standard cycle shelter.
A Senior Sheffield cycle rack for 12 cycles has also been installed.
Shepeau Stow Primary School in Spalding, rural Lincolnshire, now has a new outdoor gym.
Our installers visited the school to expand the use of its playing area with the addition of a children’s double health walker; double slalom skier; rower; horse rider; waist twister; sky stepper; tai chi discs and double strength challenger.
A bespoke entrance canopy has been installed at a refurbished supermarket.
Our teams travelled to Waitrose in Esher, Surrey, to install a version of Broxap's Burntwood canopy at the store. It perfectly matches the supermarket's exterior.
Our installation crews have been on site with McCarthy and Stone at the new Uplands Place retirement development in Cambridgeshire.
Broxap Street Furniture has manufactured and installed a Regal Cycle Shelter plus a Senior Sheffield Cycle Rack with parking space for 10 bikes.
A new social area has been created at Guilsborough Academy in Northampton. Our installation teams erected a bespoke Newcastle Senior Shelter in the grounds of the school.
Covering 18.6 metres by 11.5 metres, the structure was powder coated RAL Signal Blue to coordinate with the existing architecture with clear polycarbonate roof cladding.
A series of parklets have been installed through Caerphilly Town Centre, creating inviting dining areas for all to enjoy.
Parklets measuring 2.4m x 2m were installed throughout the HIgh Street incorporating a combination of seating, planters, bases and ramps.
Working with Tycroes Group Ltd and on behalf of Carmarthenshire County Council, an L-shaped Newcastle Senior Canopy was installed at Ysgol Dyffryn Aman School.
Part of the canopy was designed wall fixed to prevent the client moving underground services.
Our playground equipment division Hand Made Places, installed a full adventure playground for Cicely Haughton School.
Working with teachers and trustees our team designed a challenging new play area, equipped with climbing frames, trim trails and play units & towers.
Our installation teams have been working with contractor Bowmer + Kirkland on a flagship project at the University of Central Lancashire. Our Manchester MU MKII cycle hub, complete with Sheffield Cycle Racks, forms part of a new civic square and iconic gateway to the city of Preston.
Working alongside Russells Limited, our installations team have installed four bespoke 2 tier Easy-Riser Cycle Parking Systems at Chatham Waters in Gillingham.
The upper levels consisted of retractable troughs with gas-strut lifting mechanism, whilst the lower levels were Sheffield cyle racks and stands.
Belvedere Junior School had a Bespoke Wardale Cycle Shelter installed, using Trapezoidal profile curved roof cladding instead of our standard PET.
A customised Wardale cycle shelter complete with full colour vinyl has been installed at Leys Junior School in Derbyshire.
The sun came out for our installation team today which is working on a new wellbeing courtyard at the Royal Stoke University Hospital.
The Fixed Square Parasol Tensile Structure will provide cover as part of the peaceful break-out space at the Lyme Building being created by contractor Trenton Construction Co Ltd.
We're pleased to share our recent installation at Trecco Bay Holiday Park!
We installed one of our Double Conic Canopy from the Keep it Kool range. These canopies are great for covering a large outdoor area!
A big thank you to children and staff at Killermont Early Years Centre for all their support during the installation of their beautiful walkway canopy. Our experienced team cooperated with the centre and contractor Robertson Group to ensure disruption was kept to a minimum during the works.
Coventry Bus Station recently had our Easi-Riser Cycle Parking System installed. The space-saving solution for cycle storage.
The covered walkway we created for The Iffley Academy is a real work of art. Broxap Ltd operated in collaboration with architect Carissa Andrew-Smith as well as Daniel Souch, senior project manager for contractor Kier Group, to bring to life a beautiful and unique canopy design.
Two impressive canopies are currently being installed at Westvale Park Primary Academy as part of the final phase of works at the brand-new school building in Horley, Surrey. Children are due to move into the new building after Easter.
We are pleased to share these wonderful images from The College of Richard Collyer, where we installed our Twin Conic Canopy.
Robert Hardwick, Property Project Manager said the following "It looks very good and all at College seem pleased. I was very impressed by the steel work, it looks the business and overall very impressive."
The finishing touches are complete at Greater Brighton Metropolitan College, where our customer Willmott Dixon has been leading a £14m site redevelopment.
We think they are a fantastic match to the stunning new public space and entrance area and look forward to the reopening of the Central Brighton Campus to staff and students.
Broxap have been working on a very exciting project for Morgan Sindall.
We are installing a bespoke timber canopy at Stanley Street in Manchester, make sure you follow our social feeds to see the final result.