Call our sales team 01782 564411 or email [email protected]

Transfirming Places BannerTransfirming Places Banner

Transforming Places: Broxap Install Projects

We take pride in everything we design, manufacture, deliver and install – whatever its use, wherever it’s going.

Our street furniture, shelters, timber play and outdoor fitness products are built to serve generation after generation.

Here we share an insight into some of the projects our teams are currently working on. To discuss your partnership opportunities with Broxap, give us a call today.

31.08.23

31.08.23

31.08.23

24.08.23

The expansion of Stonehenge School has included the addition of new cycle parking facilities. Our teams have been on site to install a Wardale Compound with space for 48 bikes. Sheffield Cycle Racks have been provided to secure the bikes.

This Newcastle Monopitch Shelter is manufactured using Trapezoidal Steel Profile cladding. It is super-tough, providing storage at the National Highways Doxey Depot in Staffordshire.

Lighting was included in this storage shelter to support highways maintenance teams as they carry out their work round the clock. This shelter was built for the Bescot Road depot in Walsall.

Working for Willmott Dixon Construction, our teams installed a series of secure cycle parking areas as part of the new Queens Drive housing development. These are fantastic facilities for residents.

24.08.23

18.08.23

17.08.23

16.08.23

Cycle shelters, cycle parking stands, door barriers, litter bins and benches were supplied to the new Star Salford Academy for Wates Construction. We hope the new intake of students enjoy their active journeys to school each day.

These Wardale Cycle Shelters serve Sleaford Moor Enterprise Park where the first businesses are getting ready to move in. The development has a keen focus on sustainability.

A new school in Wales, currently under construction, will benefit from covered outdoor learning and play spaces. An L-shaped Newcastle Monopitch canopy has been installed along with another smaller canopy. The redevelopment of the Heol y Celyn Primary School site in Rhydyfelin will result in a state-of-the-art Welsh Medium primary school being built in partnership with Welsh Government. 

Wow! This Newcastle Duopitch canopy designed and manufactured for Ysgol Rhosnesni in Wrexham is a stunning addition to the school grounds. It’s perfect for outdoor dining!

16.08.23

10.08.23

10.08.23

03.08.23

This Blox B mesh gated front shelter provides attractive cycle parking facilities at a new affordable housing scheme in Leeds. The Throstle Rec scheme is designed to increase energy efficiency and focuses on sustainability.

This is the frame for a new Blox shelter at Oxford University. It will provide cycle parking facilities – and will eventually feature a ‘living’ sedum roof. The compound will have a two-tier cycle parking system to maximise the available parking space.

The new Wardale Compound at Whybridge Infant School looks brilliant! With a scooter rack and Sheffield cycle rack, pupils can be sure their wheels are kept safe and dry during the day.

Leighton Academy in Crewe has utilised a Lightwood shelter to create a welcoming entrance and covered waiting area outside of the school’s reception.

03.08.23

03.08.23

03.08.23

03.08.23

The modular design of the Wardale cycle shelter means it can be easily extended as more people take up the option of cycling to work, school or to the shops. This shelter extension and cycle parking rack was installed in Leicester. 

This Manual Rising Arm Barrier was reworked for Tile Mountain’s showroom just down the road from our manufacturing facility in North Staffordshire. We provide all site essentials.

Three Premier Security Cages with lockable gates have been installed at The Valley SEN School in Stevenage. Sheffield Cycle Racks have also been made available, creating secure cycle storage for staff, students and visitors.

Our installation team has been on site at Plymouth Argyle’s home ground as part of the creation of the Mayflower Fan Zone. Working for contractor Arque Limited, Broxap designed, manufactured and installed a number of  products to enhance the matchday fan experience. Broxap’s works included the provision of Litchard seating, Andromeda planters, and Kite parasols.

03.08.23

18.07.23

10.07.23

10.07.23

Contractor Morgan Sindall commissioned Broxap to provide a number of storage shelters as part of the upgrade of highways maintenance depots in the Midlands. This Newcastle Shelter at the Warndon depot is made from grey trapezoidal steel profile cladding for strength and durability.

Minster House supports independent living. This new retirement housing project in Hertfordshire includes a Wardale Cycle Compound for up to 20 bikes and a Bedworth Buggy Shelter for scooter parking and other storage.

Business and logistics parks are focusing heavily on green and sustainable methods of travel for its employees and visitors. At DP World London Gateway Broxap installed a series of cycle parking solutions for the expanding port-centric logistics park.

At Graven Hill Primary School, this super sleek Anti Vandal Wardale Shelter design was selected to provide high quality facilities for pupils. Built to a modular design, the shelters can be easily extended in the future. Scooter parking was also provided.

10.07.23

10.07.23

26.06.23

22.06.23

Kingsway Business Park in Oldham now boasts two-tier cycle parking facilities. The park is a major new employment site for the area with the potential to accommodate up to 450 jobs. Easi-Riser 2-Tier Cycle Racks (Lift Assisted) and Two-Tier Apollo Cycle Shelters have been installed for the future workforce.

The Blox C option was chosen by Jet2.com when it needed a staff cycle parking facility in the aviation area of Leeds Bradford Airport. With FSC timber cladding it fits in perfectly with the surroundings of the hangar.

The Apollo Two Tier Cycle Shelter and the Easi-Riser 2-Tier Cycle Rack (Lift Assisted) is proving very popular on business park developments. These cycle parking systems offer large capacity cycle parking facilities for busy employment sites like the new Viking Park distribution centre in Widnes.

The new Russell House headquarters for Ian Macleod Distillers is looking fantastic! The Scotch whisky company is rebuilding the historic Rosebank Distillery in Falkirk. Litchard benches and seats, a pergola, bollards and cycle parking facilities were supplied to the site.

19.06.23

14.06.23

14.06.23

14.06.23

As part of our commitment to sustainability we will always try to refurbish or rework good where possible. In this case, Leicester City Council asked us to retrofit swing gates to an existing Bedworth Buggy Shelter at County Hall.

Working for Persimmon Homes, Broxap installed two Wardale Cycle Parking Shelters and Sheffield Cycle Racks for the sought after St Nicholas Manor development in Cramlington.

Our cycle parking equipment is suitable for a wide range of locations such as this new David Lloyd gym and spa in rugby. The Apollo Cycle Shelter includes 10 Sheffield Cycle Stands which were powder coated jet black.

When a school local to us in Staffordshire was earmarked for relocation, we were happy to be involved in the remodelling of its new building. St Leonard’s Primary is moving to the Kingston Centre and we think this Newcastle Monopitch Canopy creates a really attractive outdoor space.

12.06.2023

University of StirlingUniversity of Stirling

12.06.2023

logistics centre in Barkinglogistics centre in Barking

08.06.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

06.06.2023

revamped police operations centre revamped police operations centre

The Beech Grove Entrance Canopy helps to mark out doorways and access points as well as provide shelter to those coming in and out of a building. This canopy was installed at RAF Lakenheath in Suffolk.

 

This self-storage facility in Grantham looks great with the addition of a Devonshire Entrance Canopy. The Devonshire is a wall-mounted canopy with a modern profile for a really stunning look.

 

Derby City Council has joined the #InTheLoop campaign! It is now using brightly coloured bins with graphics manufactured by Broxap to encourage more people to recycle on-the-go as they visit the city. A total of 30 bins have been supplied and installed.

 

With the Wardale Grand and Easi-Riser 2-Tier Cycle Rack (Lift Assisted), the cycle parking potential is truly maximised. This smart cycle parking facility was installed at Sovereign House at Abingdon Science Park.

06.06.2023

University of StirlingUniversity of Stirling

06.06.2023

logistics centre in Barkinglogistics centre in Barking

06.06.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

01.06.2023

revamped police operations centre revamped police operations centre

The quest to ramp up recycling rates continues at Welcome break in Oxford where 10 of the Derby Double E Recycling Bins bins created in partnership with environmental charity Hubbub have been installed.

This Blox C Mesh Gated Shelter with FSC timber cladding was installed at the new National Express bus and maintenance garage in Birmingham. The new depot aims to offer a high quality workplace with a low environmental impact.

Keeping buggies and prams clean and dry is very important to parents and carers – and so is keeping them secure when parked up outside. This Bedworth Buggy Shelter was installed at Meldreth Primary School in Cambridge.

This St John Fisher Canopy looks very smart at Tunstall C of E Primary School in Kent. The project included the design, supply, and installation of a St John Fisher canopy extension, to be connected to a previously installed Broxap shelter.

01.06.2023

University of StirlingUniversity of Stirling

01.06.2023

logistics centre in Barkinglogistics centre in Barking

01.06.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

22.05.2023

revamped police operations centre revamped police operations centre

A total of 17 Derby Double E Recycling Bins were installed at Welcome Break motorway services in Leicester. These brightly coloured bins are part of the Hubbub campaign to encourage more people to recycle while they are out and about – not just at home.

St Budeaux Library in St Budeaux Square, Plymouth has new cycle parking facilities. Our teams were on site to install an Apollo Two Tier Shelter along with an Easi-Riser parking system to accommodate up to 20 bikes at any one time. 

A Regal Cyle Shelter and Sheffield Cycle Rack provides covered, secure cycle parking facilities at the Edenstone Homes St Mary’s Village development.

These Coventry Gullwing continuous run of canopies provide covered cycle parking and storage for dozens of bikes. They were installed ready for the first cohort of students to move to the new Brian Clarke Academy in Oldham.

22.05.2023

University of StirlingUniversity of Stirling

18.05.2023

logistics centre in Barkinglogistics centre in Barking

17.05.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

20.05.2023

revamped police operations centre revamped police operations centre

A Blox B timber gated shelter was installed at Sandalwood Extra Care housing scheme. The shelter was manufactured using FSC certified timber and the design included lighting. A 12-cycle Neath rack was also installed.

Cycle parking is increasingly important for NHS sites to support staff choosing to travel by bike. At City Hospital in Nottingham we provided a run of Coventry Cantilever Cycle Shelters as well as a Coventry Gullwing Cycle Shelter and Harrogate Cycle Stands.

New student accommodation at Stanley Place in Edinburgh has incorporated high capacity cycle parking facilities for the benefit of tenants. A total of five Easi-Riser two-tier parking systems were designed, manufactured and installed for the project along with Neath Cycle Racks and Thames Bridge Cycle Stands.

Smart new cycle parking facilities have replaced outdated stands at Cardinal Allen Catholic High School in Fleetwood. The Coventry Gullwing run of cycle shelters installed by our teams keeps up to 48 cycles secure and dry with four Sheffield Cycle racks available for cycle parking.

19.05.2023

University of StirlingUniversity of Stirling

18.05.2023

logistics centre in Barkinglogistics centre in Barking

17.05.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

16.05.2023

revamped police operations centre revamped police operations centre

Student accommodation at the University of Stirling has been upgraded with new cycle parking. We installed a Wardale compound for 40 bikes with Sheffield Cycle Racks for secure parking.

Cycle parking facilities at a new logistics centre in Barking includes integrated lockers. We designed, manufactured and installed two Wardale Cycle Shelters which were fitted with Harrogate Cycle Racks and Ecolock Helmet Lockers.

The extension of Royal Bournemouth Hospital features an extensive new cycle parking area. Three unique two-tier Wardale Compounds and a continuous run of Wardale shelters were designed, manufactured and installed for the site along with 12 Easi-Riser parking systems, two Sheffield Cycle Parking Racks and six Sheffield Extra Cycle Parking Stands.

A revamped police operations centre is benefiting from the addition of a Newcastle Monopitch Shelter. With integral lighting it provides a link to a covered walkway across the site’s grounds.

15.05.2023

London Brentwood Commercial ParkLondon Brentwood Commercial Park

12.05.2023

Panattoni Park, AylesfordPanattoni Park, Aylesford

12.05.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

11.05.2023

Kingston Park SouthKingston Park South

Working for Kier Construction, Broxap designed, manufactured and installed cycle parking facilities at the University of Wales Trinity Saint David site in Swansea. A run of Cambridge Cycle Shelters with Sheffield Cycle Parking Racks contributes to the BREEAM excellent rating for the project.

.This Harrowby shelter includes an integral perch seat and cigarette bin, providing break-out facilities for employees working at a distribution centre in Enfield.

Panattoni Park in the East Midlands offers logistics facilities built to BREEAM very good ratings. Our teams have been on site to ensure workers travelling by bike have plenty of parking facilities with Wardale Shelters and Sheffield Parking Racks.

These new cycle parking facilities at Abbots Hall Primary Academy in Essex look super smart in the sunshine. The school now has parking for up to 12 cycles thanks to the popular combination of a Shefflied Cycle Rack and Wardale Cycle Shelter.

03.05.2023

London Brentwood Commercial ParkLondon Brentwood Commercial Park

26.04.2023

Panattoni Park, AylesfordPanattoni Park, Aylesford

19.04.2023

Delamere Monopitch CanopyDelamere Monopitch Canopy

18.04.2023

Kingston Park SouthKingston Park South

Providing high quality cycle parking as part of a sustainable travel plan is a must for new business sites. Our teams were at London Brentwood Commercial Park in East Horndon, Essex to install 12 bespoke lower tier cycle hoops with cross bar for added security.

Two Coventry Gullwing Cycle Shelters and a Coventry Cantilever Cycle Shelter were installed at Unit 5 Panattoni Park in Aylesford. The shelters accommodated Easi-Riser Two Tier Cycle Parking Systems.

We think this Delamere Monopitch Freestanding Canopy looks great at the St Clement’s Centre in Oxford. Our teams were on site to install the timber canopy with polycarbonate roof cladding along with two Sheffield Cycle Racks each with the capacity to store 10 bikes.

Kingston Park South in Peterborough is delivered to net-zero carbon in construction and is targeting BREEAM “Excellent”. We designed, manufactured and installed a series of bespoke Apollo Two Tier Cycle Shelters all with Easi-Riser parking racks.

17.04.2023

Fairfield Primary SchoolFairfield Primary School

06.04.2023

Royal Bournemouth HospitalRoyal Bournemouth Hospital

03.04.2023

Merryfield Special SchoolMerryfield Special School

01.04.2023

We received some really positive feedback from the Friends Of Fairfield Primary School after we installed cycle parking for pupils at the Cockermouth School. Active school runs are proving very popular.

The expansion of the Royal Bournemouth Hospital included improved cycle parking facilities. We installed three bespoke Wardale Compounds and a run of Wardale Cycle Shelters. Easi-Riser Two Tier Cycle Parking Systems, Sheffield Cycle Racks and Sheffield Extra Cycle Stands were included in the project.  

Our teams were at Merryfields School in Wolstanton, Staffordshire to add new picket around an embankment slide created for pupils by our Hand Made Places division last year.

At DMS Whittington Barracks, we designed, supplied, and installed a bespoke Newcastle shelter and seating to form a new external waiting area. The shelter is designed to accommodate personnel who are preparing for training exercises; therefore clothing hooks and seating have been included as part of the scope. Broxap was also required to supply and install three parasol shelters, as part of an addition to the order for the redevelopment of the site mess facilities.

24.03.2023

22.03.2023

20.03.2023

13.03.2023

On behalf of Pinfold Projects, works have recently been completed at Sinfin Children's Centre in Derbyshire. The overall contract included the supply and installation of a bespoke Newcastle entrance shelter which has been designed to complement the existing building façade.

We have recently commenced groundworks and the installation programme at Sir Robert Pattinson School. The scope of works incudes the design supply, groundworks and installation of two bespoke 20m shelters with a 6m covered area to form a new external dining area.

On behalf of Willmott Dixon, we have recently completed works at Horsham Fire Sation. The overall contract included the supply and installation of a bespoke Aquinas walkway canopy adjacent to the main building; a bespoke car wash canopy, and a set of bespoke Harrowby waiting shelters.

Folks at the Forsbrook Recreational Centre in Staffordshire can now enjoy a variety of outdoor exercises thanks to our dedicated installation's team, who were able to install a range of outdoor gym equipment despite the misearble, cold weather.

16.02.2023

14.02.2023

30.01.2023

17.01.2023

Works have recently been completed on three of the hospital sites for Manchester Hospital NHS Trust. The overall contract for this project covers design, manufacture, supply, and installation of three cycle shelters. All works were completed within the agreed programme date.

After recently completing installation works at Alec Reed Academy, pupils can now enjoy an outdoor learning area. The multi-faceted Newcastle Shelter was specifically designed to follow the contour of the existing school building, offering extended classroom areas.

Works began at Fitzalan High School at the end of November. Since then, we have completed phase one of the installation process installing two tensile canopies at the service yard. Phase two is to commence in February.

Penair Secondary School have recently had their bespoke Newcastle Senior Shelter installed. This neatly asssembled shelter covers the entrance and areas of the staircase.

11.01.23

03.01.23

30.11.22

28.11.22

We have been working with Willmott Dixon to design, supply and install a bespoke Newcastle Monopitch for a new police station and custody suite in Llanelli. The order also includes an Archimedes Cycle Shelter with Sheffield Cycle Stands

Eastland Grange Retirement home is pleased with its recent installation of a  modern and stylish Devonshire Entrance Canopy.

This will help to protect the residents from the elements.

 A recent installation at Good Shepherd Catholic School consists of a bespoke 70m Newcastle Shelter to the north of the school, a bespoke 35m Newcastle Shelter to the south of the school, a twin conic tensile canopy and a Cambridge Hybrid cycle Shelter.

Pupils at St Paul's Primary School can now enjoy learning outdoors under the Westgate Outdoor Classrom which includes a shade sail, Storyteller's Chair and seating.

23.11.22

19.10.22

18.10.22

17.10.22

Taunton School pupils and staff can now enjoy break time outdoors under our Double Conic Canopy

Travellers at London Luton Airport can now stay safe and protected from the harsh weather as our team installed a run of bespoke shelters

Paxton Academy Sports & Science have uplifted their outdoor play area with a Tunnel Climber, Ocean Tray & Chute, Extra Large Sand Pit, Teepee, Mud Kitchen, Play Den, Totems, Chalk Boards, Star Stage and so much more! 

Proud to be a part of Kingsbrook Secondary School new state of the art development, installing a vast variety of canopies, shelters, seating, bollards, planters, litter bins, and cycle parking equipment. 

06.10.22

29.09.22

26.09.22

20.09.22

The children at Little Sutton School can now enjoy physical development activities, as we installed our Townhill Multiplay Unit, Milton Play Unit and Timber MUGA.

Investing in a greener, cleaner and sustainable future, Manor Drive School can now accommodate for up to 20 cycles with our Apollo Two Tier Cycle Shelter. 

Sunderland City Council are helping to tackle litter problems with our flagship Derby Standard Litter Bins. 

13.09.2022

09.09.2022

08.09.2022

07.09.2022

Our teams have been on site installing four bespoke shelters, Sheffield cycle racks and door barriers for Edgar Wood Academy in Lancashire.

 Our teams have been on site installing a Darell Gazebo. This is one of our most popular timber gazebos. Its versatility means it can be used in a number of ways such as for outdoor learning or to offer playground shade.

We have completed an extensive project at Gayton Primary School. The project included a run of Junior Apollo Shelters, Sheffield Cycle Stands, Scooter Racks, Sherwood Benches, Balksbury Play Unit and Darell Gazebo.

Staff and Students at University Of Surrey Research Park can now enjoy their break outdoors. The project included Litchard Picnic Units, benches, and Maelor Traflex Round Litter Bins.

05.09.2022

28.08.2022

22.08.2022

16.08.2022

Student accomodation in Lanarkshire has had a major cycle parking overhaul with Broxap's Run of Wardale Grande Shelter to suit Two-Tier Cycle System, which has the capacity for 96 cycles! 

Back to school! Hartford Manor Community Primary School are enjoying their recently installed outdoor gym, where up to 15 children can exercise together at the same time.

Outdoor improvements have been completed at Denton Community College in time for the start of the new school year. Working for client Robertson Facilities Management, Broxap has designed, manufactured and installed a series of canopies and walkways.

We've recently installed a freestanding Delamere Canopy in the courtyard of Merstham Park Secondary School, along with several Sheffield Cycle Racks, a bespoke timber cycle compound and Luton Entrance Canopy

11.08.2022

10.08.2022

08.08.2022

04.08.2022

Parkdean Southview Twin Conic Photos Parkdean Southview Twin Conic Photos

In Stirling, 13 Litchard Seats with grade 304 stainless steel ends have been installed in the city centre. Residents and tourists are delighted with the installation. 

The children at Northlands Primary School & Nursery are already enjoying their new outdoor gym that has been installed, consisting of a Children's Activ8 Multi Gym and Children's Motiv8 Multi Gym. 

Princess Royal University Hospital in Kent is currently having a bespoke Monopitch Glass Entrance Canopy installed. 

Our teams travelled to Waitrose in Longfield, to install Broxap's Burntwood canopy at the store. 

03.08.2022

William Allitt SchoolWilliam Allitt School

14.07.2022

William Allitt SchoolWilliam Allitt School

01.07.2022

Glassford Primary Glassford Primary

30.06.2022

Parkdean Southview Twin Conic Photos Parkdean Southview Twin Conic Photos

The installation team are back at Luton Airport, installing more bespoke galvanised shelters

A bespoke Faceted Barton Cantilever Tensile Motorcycle Canopy has been installed at MOD Abbeywood. Fixed with submerged baseplates and waterproof PVC roof cladding. 

Hamilton Grammar School is very pleased with its bespoke Newcastle aluminium shelter with guttering and rainwater pipes.

A series of bespoke walkways and shelters have been installed at Luton Airport.  

22.06.2022

William Allitt SchoolWilliam Allitt School

18.06.2022

William Allitt SchoolWilliam Allitt School

16.05.2022

Glassford Primary Glassford Primary

15.06.2022

Parkdean Southview Twin Conic Photos Parkdean Southview Twin Conic Photos

A series of Newcastle Monopitch Walkways/canopies has recently been installed at Firwood School.

 

The “safe fix” aluminium glazing bar system reduces the steel work requirement providing a more aesthetic design, whilst maintaining Broxap’s structural standards. The push fit 600m wide roof panels also allow for easy installation saving time on site.

A Newcastle Cycle Compound with 2 Tier Cycle Racks have been installed at St George's University Hospital. 

Recently a blox compound and ten Easi Riser systems have been installed at at Christie Hospital.

The installation team has installed cyle parking at Buildnet UK featuring a Littleborough Cycle Shelter and Sheffield Cyle Rack.

09.06.2022

William Allitt SchoolWilliam Allitt School

19.05.2022

William Allitt SchoolWilliam Allitt School

10.05.2022

Glassford Primary Glassford Primary

20.04.2022

Parkdean Southview Twin Conic Photos Parkdean Southview Twin Conic Photos

Students at Rudston Primary School are having fun and making use of their outdoor gym equipment including a childrens double sit up bench, waist twister, double strength challenger, tai chi discs, double slalom skier and balance beams. 

A Newcastle Monopitch Canopy and Wardale Cycle Shelters have been installed at Chapel Lane School, for Morgan Sindall.

An Apollo Shelter, Cambridge Shelter, three Easi-Risers and three Sheffield Cycle Racks have been installed at Silverstone Park.

The installation team has installed cyle parking at Isleworth & Syon School, a school in Middlesex featuring a Littleborough Cycle Shelter and Sheffield Cyle Rack.

19.05.2022

University of BathUniversity of Bath

16.05.2022

William Allitt SchoolWilliam Allitt School

14.04.2022

Glassford Primary Glassford Primary

13.04.2022

Parkdean Southview Twin Conic Photos Parkdean Southview Twin Conic Photos

The head teacher is very happy with our recent playground installation at Whitewater Primary School. 

This Anti-Vandal Wardale Cycle Shelter has been installed at Leverndale Hospital in Glasglow with custom-designed side panels. 

Parkdean Newquay Holiday Park has a fresh new look! Our Installation team have been kept busy and have installed a canopy, playground equipment, and a basketball pitch! 

Broxap’s installation team have installed a twin conic for Parkdean Southview.  The canopy will provide shade and a cover for people who wish to sit and enjoy time outdoors whilst at Holiday Park. 

06.04.2022

University of BathUniversity of Bath

31.03.2022

William Allitt SchoolWilliam Allitt School

21.03.2022

Glassford Primary Glassford Primary

17.03.2022

Roger Ascham Library Roger Ascham Library

A raft of improvement works have been carried out by our teams at the University of Bath. Working with client Dave Lucey Limited, two Fixed Square Parasols have been installed on campus. The Tensile Structures form part of a new outdoor recreation zone. Twelve Mild Steel Bench Units, two of our Fire resistant Derby BBQ Secure bins and an Outdoor Table Tennis Table also form part of the scheme.

Two sleek new cycle shelters have been installed at The William Allitt School in Swadlincote, Derbyshire. Our teams have fitted a run of two New Sheffield Junior Cycle Shelters at the secondary school, each with clear cladding and a galvanised frame powder coated Dark Blue. Two mild steel Sheffield Junior Cycle Racks complete the project, providing secure cycle parking for a total of 20 bikes.

Scooter and cycle parking has been installed at Glassford Primary, a school in South Lanarkshire.


Our teams were on site at Glassford Primary School where our standard Wardale Shelter now accommodates a Junior Sheffield Cycle Rack for up to eight bikes. A single sided Scooter Rack also fits inside the shelter, with parking space for 10 scooters.


Our customer South Lanarkshire Council aims to increase the number of children walking, cycling and using public transport to travel to school. It is hoped having dedicated secure storage at Glassford Primary School will encourage more pupils to cycle or scoot to lessons.

Broxap’s installation team has completed a cycle parking scheme as part of works to convert a library. The former Roger Ascham library facility in Cambridge will now house the Cambridgeshire Register Office. Working with principal contractor Borras Construction Limited, we installed a Wardale Cycle Shelter on site along with a Senior Sheffield Cycle Rack with four hoops. The shelter will provide secure cycle parking for eight bikes. Three further Sheffield Stands were also supplied.

14.03.2022

Little CarnfieldLittle Carnfield

08.03.2022

Tumble Car Park Tumble Car Park

28.02.2022

Integrated Medical Centre (IMC)Integrated Medical Centre (IMC)

24.02.2022

Holyoakes Field School Installation Holyoakes Field School Installation

Extensive cycle parking infrastructure has been installed at the site of a former banana factory in Essex, Little Canfield. Five New Sheffield Shelters have been installed along with five Senior Sheffield Cycle Racks at the site in Little Canfield. Our teams have been working in partnership with contractor Ashe Construction on the redevelopment project.

A car park now also features parking for bicycles too. Broxap was commissioned as part of a Carmarthenshire County Council cycle parking scheme to install the Castleford Shelter and three Senior Sheffield Cycle Stands. The parking facilities are available in Tumble Car Park in Llanelli.

Installation teams visited the site of a new Integrated Medical Centre (IMC) to complete cycle parking works. Our installers worked with client Neilcott Construction to fit a standard Wardale Shelter at the IMC in Corringham, Essex. Broxap Street Furniture also supplied 11 stainless steel Sheffield Cycle Hoops; five stainless steel bollards and one our Weyburn mild steel open top bins.

Our design and installation teams have worked around challenging ground conditions to complete a cycle parking shelter for Holyoakes Field First School in Redditch. Our bespoke Premier Cycle Shelter will accommodate 24 cycles, and a mix of junior and senior Sheffield Cycle Stands have also been installed by Broxap. Children who scoot to school can safely leave their scooters in one of three Single Sided Sooter Racks which we supplied.

15.02.2022

11.02.2022

07.02.2022

02.02.2022

We’ve completed work on a new entrance canopy and covered walkway at Tor View School in Lancashire.

The work formed part of a project being carried out by Landscape Engineering Limited and provides a warm welcome for pupils, staff, parents and visitors.

Our engineers came up with a bespoke Newcastle Monopitch/Duopitch design with clear roof cladding and a galvanised and polyester powder coated steel framework.

Our installation team has completed a cycle parking project for Cambridge City Council. 

A customised Wardale Shelter has been installed in Edgecombe, featuring trapezoidal roof and end panel cladding. 

Swing mesh gates with mechanical coded lock help to ensure bikes are left securely, with a Senior Sheffield Cycle Parking Rack for 12 cycles also installed with the shelter. 

New cycle parking is now available at Whittington Hospital in London. Workign with Richard Morris (Constrution) Limited, we supplied and installed a shelter and cycle rack in the hospital grounds. 

The Lightwood standard Shelter has clear cladding with a galvanised steel frame, powder coated black. Our Senior Sheffield Cycle Rack had six hooops to provide capacity for 12 cycles. 

Cycle parking has been enhanced at a prestigious business location with support from Broxap. Our teams have completed the installation of three Wardale Cycle Shelters at The Heights in Weybridge.

The shelters all feature clear cladding and a smart galvanised and powder coated frame. Each comes with a Sheffield Cycle Rack made up of five hoops, giving the shelters secure parking capacity for 10 bikes.

The work was carried out on behalf of sustainable travel experts Road Pals Limited, trading as easiNETWORK.

31.01.2022

28.01.2022

27.01.2022

27.01.2022

Children at Ripley Nursery School in Derbyshire can now enjoy their playground again after our team installed a new canopy.

Our freestanding Newcastle Monopitch canopy provides covered access to and from the nursery school, and a safe, dry area for youngsters to play and learn.

Cycle parking has been installed at a Buckinghamshire School undergoing a £5.8 million expansion. 

Our team has insalled Broxap's Premier Continuous Run of shelters at Amersham School. With  capacity for 40 cycles, the shelter has clear mutliwall polycarbonate roof cladding and its galvanised framework is powder coated RAL 9005 Black. 

The cycle parking element of a project carried out for B&k Building Services has been completed at a major new distribution centre. 

The Amazon EMA2 site in Sutton-in-Ashfield offers cycle parking for 40 bikes. Two Coventry Gullwing Canopies keep the cycles and riders safe and dry, with the bikes secured to our Senior Sheffiled Parking Racks. Our teams were on site earlier in the year to also install bespoke smoking shelters

Cycle parking has been installed at Hartford CE High School in time for the return of students following the winter break.

Our engineers came up with a customised Wardale Shelter for the school to accommodate up to 28 bikes. The galvanised steel shelter has been powder coated RAL 5015 sky blue and includes mesh sliding gates. Three Senior Sheffield Cycle Racks were also installed.

25.01.2022

19.01.2022

18.01.2022

13.01.2022

Our installers have completed a series of fabric structures as part of a £12 million new school build.

The outdoor canopies have been installed at Alfreton SEN School in Derbyshire and include two fixed parasols and a triangle perimeter beam shade sail canopy.

The installations will enable students to make the most of their outdoor areas when the new school, being built by contractor Henry Brothers, opens later this year.

Cycle parking has been included in a new housing development.

Broxap teams have installed a New Sheffield Shelter and a Senior Sheffield Cycle Rack, for up to eight bikes, at the Vistry Homes site in Wombourne. Fletcher’s Rise is a collection of two, three, four and five bedroom homes.

 

A school’s outdoor area has been upgraded with a shelter from Broxap Street Furniture.

Western Primary School in Winchester has invested in a Bespoke Newcastle Monopitch Canopy. Pupils can now take advantage of learning outdoors whatever the weather.

Broxap’s cycle parking products are supporting Carmarthenshire’s bid to become the Cycling Hub of Wales.

Our teams have installed a Wardale Anti Vandal Shelter at Carmarthen Leisure Centre including seven Sheffield Senior Cycle Stands. The work forms part of the Carmarthenshire active travel network to connect residential areas with shopping, employment, healthcare and leisure sites.

06.01.2022

04.01.2022

22.12.2021

21.12.2021

Our installation teams have completed a cycle parking project for Carmarthenshire County Council.

The Wardale shelter and Sheffield cycle parking stands have been installed in Quay Street, Ammanford, as part of the council’s parking strategy.

It hopes that by providing the facilities, more visitors to the town centre will be encouraged to travel via more sustainable forms of transport.

New cycle parking facilities have been installed as part of a depot expansion at metal distributor Kloeckner Metals UK. 

Our team visited the company's Dudley site to install a standard run of Broxaps Apollo Shelters to accomodate up to 15 cycles. 

Fiftenn of our Sheffield Senior Cycle Stands were also supplied. 

Supermarket Waitrose in Hexham has a new van loading canopy and a covered walkway.

Our installation teams have been on site to carry out the works which included a Newcastle Senior Shelter in the van loading area. This oversails a second bespoke shelter which forms a covered walkway around the building.

Cycle parking has been installed at a new logistics park. Working for client Readie Construction, our installation teams have been on site at G Park, Bedford, to complete the project which includes parking for motorbikes and cycles.

Our Apollo standard shelter includes a bespoke parking rack for five motorbikes while our senior Harrogate cycle rack provides parking for 30 cycles, protected by another Apollo shelter. A parking rack for a further eight cycles has also been installed.

21.12.2021

20.12.2021

17.12.2021

15.12.2021

Secure cycle parking has been installed at a new housing development in Peterborough.

Working for client Lindum Group, our installers completed the works for a Wardale Shelter to accommodate 12 cycles.

The shelter features a high security swing gate and a Senior Sheffield Cycle Rack.

Smoking shelters have been installed at a new distribution centre run by Amazon. The site at Summit Park in Sutton-in-Ashfield now features two glazed shelters manufactured by Broxap to a bespoke design.

The shelters include cigarette bins, lighting and our Litchard benches. Two Coventry Gullwing canopies are also being installed to offer cycle parking for 40 bikes, featuring our Senior Sheffield parking racks.

Two bespoke Burntwood canopies have been installed by our teams at Waitrose in Beckenham.

The canopies form a drive-through collection point for online orders. Customers park under the canopy in a dedicated spot before being greeted by a member of staff and the items brought to their vehicles.

Children at Linton Primary School in Swadlincote can look forward to learning outdoors under the protection of a Newcastle Monopitch shelter.

The canopy includes a PVC roll-up blind to one end to provide shade in the summer and protect against the wind in the winter. Guttering and protective foam pads have been installed as part of the project.

13.12.2021

MOD Lyneham Wardale standard cycle shelter and a Senior Sheffield cycle rack for 12 cycles has also been installed.MOD Lyneham Wardale standard cycle shelter and a Senior Sheffield cycle rack for 12 cycles has also been installed.

23.11.2021

New Outdoor Gym installed at Shepeau Stow Primary School New Outdoor Gym installed at Shepeau Stow Primary School

19.11.2021

bespoke Burntwood canopy at Waitrose in Esher, Surreybespoke Burntwood canopy at Waitrose in Esher, Surrey

26.10.2021

Regal Cycle Shelter plus a Senior Sheffield Cycle Rack with parking space for 10 bikes at the new Uplands Place retirement development in Cambridgeshire Regal Cycle Shelter plus a Senior Sheffield Cycle Rack with parking space for 10 bikes at the new Uplands Place retirement development in Cambridgeshire

An MOD site in Wiltshire has new cycle parking in place.

Our installers visited MOD Lyneham to complete the works for a Wardale standard cycle shelter.

A Senior Sheffield cycle rack for 12 cycles has also been installed.

Shepeau Stow Primary School in Spalding, rural Lincolnshire, now has a new outdoor gym.

Our installers visited the school to expand the use of its playing area with the addition of a children’s double health walker; double slalom skier; rower; horse rider; waist twister; sky stepper; tai chi discs and double strength challenger.

 

A bespoke entrance canopy has been installed at a refurbished supermarket.

Our teams travelled to Waitrose in Esher, Surrey, to install a version of Broxap's Burntwood canopy at the store. It perfectly matches the supermarket's exterior.

Our installation crews have been on site with McCarthy and Stone at the new Uplands Place retirement development in Cambridgeshire.

Broxap Street Furniture has manufactured and installed a Regal Cycle Shelter plus a Senior Sheffield Cycle Rack with parking space for 10 bikes.

10.09.2021

Bespoke Newcastle Senior Shelter at Guilsborough Academy in NorthamptonBespoke Newcastle Senior Shelter at Guilsborough Academy in Northampton

26.06.2021

parklets installed through Caerphilly Town Centreparklets installed through Caerphilly Town Centre

24.06.2021

L-shaped Newcastle Senior Canopy at Ysgol Dyffryn Aman SchoolL-shaped Newcastle Senior Canopy at Ysgol Dyffryn Aman School

23.06.2021

full adventure playground for Cicely Haughton Schoolfull adventure playground for Cicely Haughton School

A new social area has been created at Guilsborough Academy in Northampton. Our installation teams erected a bespoke Newcastle Senior Shelter in the grounds of the school.

Covering 18.6 metres by 11.5 metres, the structure was powder coated RAL Signal Blue to coordinate with the existing architecture with clear polycarbonate roof cladding.

A series of parklets have been installed through Caerphilly Town Centre, creating inviting dining areas for all to enjoy. 

Parklets measuring 2.4m x 2m were installed throughout the HIgh Street incorporating a combination of seating, planters, bases and ramps.

Working with Tycroes Group Ltd and on behalf of Carmarthenshire County Council, an L-shaped Newcastle Senior Canopy was installed at Ysgol Dyffryn Aman School.

Part of the canopy was designed wall fixed to prevent the client moving underground services.

Our playground equipment division Hand Made Places, installed a full adventure playground for Cicely Haughton School.

Working with teachers and trustees our team designed a challenging new play area, equipped with climbing frames, trim trails and play units & towers.

27.05.2021

Manchester MU MKII cycle hub, complete with Sheffield Cycle Racks at University of Central LancashireManchester MU MKII cycle hub, complete with Sheffield Cycle Racks at University of Central Lancashire

21.05.2021

bespoke 2 tier Easy-Riser Cycle Parking Systems at Chatham Waters in Gillinghambespoke 2 tier Easy-Riser Cycle Parking Systems at Chatham Waters in Gillingham

19.05.2021

Bespoke Wardale Cycle Shelter at Belvedere Junior SchoolBespoke Wardale Cycle Shelter at Belvedere Junior School

18.05.2021

customised Wardale cycle shelter complete with full colour vinyl installed at Leys Junior School in Derbyshire.customised Wardale cycle shelter complete with full colour vinyl installed at Leys Junior School in Derbyshire.

Our installation teams have been working with contractor Bowmer + Kirkland on a flagship project at the University of Central Lancashire. Our Manchester MU MKII cycle hub, complete with Sheffield Cycle Racks, forms part of a new civic square and iconic gateway to the city of Preston.

Working alongside Russells Limited, our installations team have installed four bespoke 2 tier Easy-Riser Cycle Parking Systems at Chatham Waters in Gillingham. 

The upper levels consisted of retractable troughs with gas-strut lifting mechanism, whilst the lower levels were Sheffield cyle racks and stands.

Belvedere Junior School had a Bespoke Wardale Cycle Shelter installed, using Trapezoidal profile curved roof cladding instead of our standard PET. 

A customised Wardale cycle shelter complete with full colour vinyl has been installed at Leys Junior School in Derbyshire.

30.03.2021

Fixed Square Parasol Tensile Structure at the Royal Stoke University HospitalFixed Square Parasol Tensile Structure at the Royal Stoke University Hospital

05.02.2021

 Double Conic Canopy at Trecco Bay Holiday Park! Double Conic Canopy at Trecco Bay Holiday Park!

19.03.2021

Walkway Canopy at Killermont Early Years CentreWalkway Canopy at Killermont Early Years Centre

01.03.2021

Easi-Riser Cycle Parking System at Conventry Bus StationEasi-Riser Cycle Parking System at Conventry Bus Station

The sun came out for our installation team today which is working on a new wellbeing courtyard at the Royal Stoke University Hospital.

The Fixed Square Parasol Tensile Structure will provide cover as part of the peaceful break-out space at the Lyme Building being created by contractor Trenton Construction Co Ltd.

We're pleased to share our recent installation at Trecco Bay Holiday Park!

We installed one of our Double Conic Canopy from the Keep it Kool range. These canopies are great for covering a large outdoor area!

A big thank you to children and staff at Killermont Early Years Centre for all their support during the installation of their beautiful walkway canopy. Our experienced team cooperated with the centre and contractor Robertson Group to ensure disruption was kept to a minimum during the works.  

Coventry Bus Station recently had our Easi-Riser Cycle Parking System installed. The space-saving solution for cycle storage.

25.02.2021

Covered walkway at Iffley AcademyCovered walkway at Iffley Academy

24.02.2021

Two New Canopies Being Installed at Westvale Park Primary AcademyTwo New Canopies Being Installed at Westvale Park Primary Academy

17.02.2021

Twin Conic Canopy at The College of Richard Collyer Twin Conic Canopy at The College of Richard Collyer

10.02.2021

finishing touches are complete at Greater Brighton Metropolitan Collegefinishing touches are complete at Greater Brighton Metropolitan College

The covered walkway we created for The Iffley Academy is a real work of art. Broxap Ltd operated in collaboration with architect Carissa Andrew-Smith as well as Daniel Souch, senior project manager for contractor Kier Group, to bring to life a beautiful and unique canopy design.  

Two impressive canopies are currently being installed at Westvale Park Primary Academy as part of the final phase of works at the brand-new school building in Horley, Surrey. Children are due to move into the new building after Easter. 

We are pleased to share these wonderful images from The College of Richard Collyer, where we installed our Twin Conic Canopy.

Robert Hardwick, Property Project Manager said the following "It looks very good and all at College seem pleased. I was very impressed by the steel work, it looks the business and overall very impressive."

The finishing touches are complete at Greater Brighton Metropolitan College, where our customer Willmott Dixon has been leading a £14m site redevelopment.

We think they are a fantastic match to the stunning new public space and entrance area and look forward to the reopening of the Central Brighton Campus to staff and students.

25.11.2020

bespoke timber canopy at Stanley Streetbespoke timber canopy at Stanley Street

Broxap have been working on a very exciting project for Morgan Sindall.

We are installing a bespoke timber canopy at Stanley Street in Manchester, make sure you follow our social feeds to see the final result.

^Top